If any discrepancy exists…
1. Specifications trumps working drawings.
Updated: Apparently that is NOT true! Specifications and working drawings are complimentary to each other. If contractor notices discrepancy between the two, the first thing to do is to bring it to the architect’s attention. (source: ballast Q&A)
2. Working drawings trumps shop drawings.
3. Written word (e.g. four hundred and ten) trumps numerical figures (e.g. 410) in bid forms.
4. Owner/ Contractor Agreement trumps General Conditions.
Interesting that Ballast says specs don’t trump drawings. I have always been told that. Good to know! Thank you !